CONSULTING DELIVERABLES
Current-state processes and gap list W1–W2
Phased delivery roadmap W3
Requirements baseline W4
Scope confirmation and freeze GATE

On-Site Discovery That Spells Out Every Gap

Consulting engagements usually run for two to four weeks. The deliverable is not a slide deck, but three executable documents: a current-state process map and gap list, a phased roadmap with budget ranges and timeline estimates, and a requirements baseline.

These three documents are the sole reference for subsequent development and acceptance. Once the client confirms them, requirements are frozen; new ideas go through the change process so that work is not redone as it progresses. Clients may also purchase consulting only and organise the build themselves after the roadmap is delivered.

  • On-site interviews with business departments and front-line operators, recording each bottleneck
  • Phased roadmap with clear goals, budget ranges, milestones and acceptance criteria for each phase
  • Requirements baseline signed off by the client as the reference for development and acceptance
  • System selection and integration advice comparing similar products on functionality and operating cost

Deliverables

Handed over in full at project close, so the client can take over and operate it themselves or continue with our operations team.

Current-State Process Maps and Gap Lists

Record item by item the actual processes of business departments and frontline roles, repeated confirmation steps, and data gaps.

Phased Development Roadmap

Define each phase's goals, budget range, schedule estimate, delivery milestones, and acceptance criteria.

Requirement Baseline Specification

Frozen after client confirmation and used as the sole basis for subsequent development and acceptance.

System Selection and Integration Recommendations

Compare similar products' functional coverage and operations costs, and propose an actionable integration path.

Implementation Rhythm

Every phase has clear deliverables and an accepting owner; process and outputs are fully traceable.

W1–W2
On-Site Interviews and Process Reconstruction
Cover business departments and frontline roles, reconstructing real operating steps and document flows by position.
W2–W3
Gap Root-Cause Analysis and Option Comparison
Distinguish process, data, and system problems, and compare alternative development paths and costs.
W3–W4
Roadmap and Baseline Development
Deliver a phased roadmap, budget range, and requirement baseline specification, and organize a client review.
GATE
Scope Confirmation and Freeze
Requirements are frozen after client confirmation, and new ideas go through the change process.

FAQ

Answers reflect our actual practices; response standards and delivery boundaries are governed by the contract.

How long does the consulting phase take?
Usually 2 to 4 weeks, depending on the number of business departments and process complexity; the final deliverables are three executable documents, not a reporting PPT.
Can we purchase consulting only, without commissioning development?
Yes. Once the roadmap and requirement baseline are delivered, clients can organize construction themselves, and we can also take part in later reviews as agreed.
How are requirement changes handled mid-project?
The baseline is frozen after client confirmation, and new ideas go through the change process: assess scope and schedule impact first, then decide whether to include them in this phase, avoiding rework from changing things midstream.

Custom Digital Platform Development

Management platforms, mobile apps and data interfaces tailored to your business scenarios, with source code and full technical documentation delivered.

Learn More

Data Visualization & Decision Support

Build a unified data platform and visual dashboards so every decision rests on one consistent set of facts.

Learn More

AI and AI Agent Engineering

Integrate intelligent applications with existing business systems, starting with clear data scope, permission boundaries and acceptance criteria.

Learn More

System Operations & Continuous Optimization

24/7 monitoring, regular health checks and version upgrades keep the system stable and valuable over the long term.

Learn More