When a two-week iteration cadence is introduced in government and enterprise projects, the most common objection is "requirements will change, and with a locked baseline we cannot work." That sentence misunderstands requirement freezing. By locking the baseline, we do not mean nobody may change requirements. We mean every change leaves an impact assessment and a cost record. Changes are allowed, but how much, who is affected, and who pays must be written down.

What the Requirement Baseline Locks

At the start of each iteration, the scope of requirements for that iteration is locked as the baseline. The baseline locks "what to do this week," not "what the project will eventually look like." Work inside the scope is completed without compromise; new ideas outside the scope enter the change pool and are scheduled for the next iteration. This mechanism makes the "two weeks" commitment credible, because the team does not have to absorb unevaluated requirements mid-iteration.

What the Change Impact Assessment Writes Down

For each item in the change pool, the delivery lead answers three questions before scheduling: which completed modules are affected? How much work is added, in person-days? If it displaces the current iteration, which committed items will be delayed? The answers are written into the change record and confirmed with the client before entering the baseline. The argument therefore shifts from "can it be done" to "is it worth doing now," and the quality of the discussion changes completely.

Cost Records Accumulate Trust

A cost record for every change looks like a constraint in the short term and trust in the long term. At project wrap-up, this record answers the questions of most concern to the client: why the delivery cycle was this long and where the money went. In our projects, teams with complete change records have almost no wrangling at acceptance; teams with missing records end up renegotiating at acceptance.

Two Weeks Is Not a Dogma

A two-week iteration is our default cadence, not a dogma. What matters is the stability of the cadence itself: the client knows when to raise requirements, when to see results, and when to decide on changes. With that cadence, locking the requirement baseline has meaning.